The only Wunderbuild template built for Australian concreters.
Slabs, footings, driveways, paths with pre-loaded formulas, standard mixes, and margin-safe pricing. Purpose-built for concreters who quote by the metre, not the trade rate.
What's Included In
Our Wunderbuild
Concreters Template
Purpose-built line items, mix libraries, and calculators — configured for the way concrete jobs actually get quoted.
Concrete-Specific Line Items
Pre-configured for M², M³, and LM. Slabs, driveways, volumes, footings, edges — all in the units you actually quote in.
Mix + Reinforcement Library
Standard mixes from 20MPa to 40MPa pre-loaded with current pricing. SL72 through SL92 mesh, bar chairs, ties, and mesh supports built in.
Formwork Calculators
Timber shutters, ties, braces, and edge details. Quantity outputs based on slab dimensions.
Client-Ready Quotes, Auto-Generated
Your finished quote — Campbells-branded, 13 pages, generated straight from your takeoff. Cover page, itemised summary, full specifications, description of works, and 20-clause terms & conditions. Ready to send.
- ✓ Branded cover with client details, quote reference, dates
- ✓ Itemised summary — 18 sections rolled up to a GST-inclusive total
- ✓ Full specifications — 9 categories, all disclaimers included
- ✓ Description of works — plans and engineering reference
- ✓ 20-clause terms & conditions — variations, delays, cracking, cure times, disputes
- ✓ Signed acceptance page for client sign-off
Every quote pulls live from your takeoff and costings — change a quantity, the quote updates.
Subscriptions Pricing
Subscription-based access to advanced estimating systems, the same level of operational efficiency that top-tier builders use to manage 600–800 homes annually. Annual plans, paid upfront. All prices exclude GST.
Concreters Template
For concreters quoting slabs, footings, driveways, and paths.
Billed annually as $1,788 +GST
Built for Concreters who quote by the metre.
The only estimating template on the market purpose-built for Australian concreters. Slabs, footings, driveways, paths — pre-loaded formulas, standard mixes, and margin-safe pricing you can send today.
Frequently Asked Questions
Find answers to common questions about our services, processes, and programs
A complete Wunderbuild estimating framework built specifically for Australian residential concreters. It ships with 105 pre-configured takeoff items across 16+ groups (earthworks, footings, piers, screw piers, slab types, reinforcement, edge beams, internal beams, thickenings, conventional slab area, and plan measurement), 34 costing categories with markup pre-set at 25%, 9 spec categories covering everything from preliminaries to exclusions, and a full 20-clause terms & conditions library — all ready to use on your first quote.
Residential concreting end-to-end — slab pours (conventional and waffle pod), footings and piers (450mm and 600mm concrete piers, screw piers, dowel bars), driveways and pathways with exposed aggregate finishes, edge beams, internal beams, slab thickenings, reinforcement (mesh, bar chairs, ties, corner bars), formwork, concrete pump hire, and concrete labour. If it's part of a residential slab or hardstand job, it's in there.
Nine ready-to-use spec categories: Preliminaries (engineering, certification, insurances, OWH&S), Machine Hire / Earthworks / Spoil Removal, Slab / Footings / Piers, Concrete Finishes (epoxy / polished concrete), Driveways / Pathways, Exclusions, Client Notifications, Description of Works, and Terms & Conditions. Every disclaimer a concreter should be sending — ground water, underground services, rock breaking, weather delays, cracking, cure times — is pre-written.
Usable. They're 20 numbered clauses written for concreting specifically — covering acceptance, scope, pricing, variations, payment terms, access, underground services, delays, concrete performance and cracking disclaimers, drainage falls, damage to surroundings, cure times, ownership, warranty, cancellation, safety, dispute resolution, and governing law. Written to reduce disputes and protect you on the jobs you actually do.
The Concreters Template is standalone for individual trades. If you're a builder subcontracting multiple trades, look at the Detailed Template instead.

